9 Years

of experience

Remodel Your Bathroom for Comfort and Function

Bathroom remodels in Odessa that include layout changes, custom tile, vanity upgrades, and moisture-resistant materials.

Your bathroom in Odessa has a cramped shower, outdated tile, and a vanity with minimal storage. The layout feels awkward, the grout is stained, and the fixtures are worn from years of use. A bathroom remodel addresses these issues by reconfiguring the layout, expanding the shower, installing new tile and fixtures, and updating plumbing to meet current building standards. NCG Construction Group, LLC coordinates the design, permitting, and construction so the project moves forward without delays or miscommunication between trades.

The remodel includes removing old tile, fixtures, and cabinetry down to the studs, then installing moisture barriers, updated plumbing, and new electrical for vanity lighting and ventilation. You can expand a standard tub-shower combo into a walk-in shower with a low-profile base and frameless glass, or add a freestanding tub in a primary suite. Materials are selected for their resistance to humidity, ease of cleaning, and long-term durability in Florida homes.

Schedule a bathroom remodeling estimate to review your layout, discuss fixture options, and plan an upgrade that improves comfort and resale value.

What You Notice After the Remodel Is Done

Demolition exposes the subfloor, wall framing, and existing plumbing, which are inspected for water damage or code violations before new materials are installed. In Odessa, where humidity can cause hidden moisture issues, any damaged framing or subflooring is replaced before tile or fixtures go in. You finalize tile layout, grout color, vanity dimensions, and fixture finishes during planning so rough-ins are positioned correctly and the installation proceeds without delays.

Once the tile is set and grouted, you see clean lines, level surfaces, and corners that meet without gaps or lippage. The shower has even water coverage from a new valve and showerhead, and the floor slopes correctly to the drain without pooling. The vanity includes drawers that close smoothly, and the countertop has enough space for daily items without clutter.

Lighting is installed above the mirror and in the shower to eliminate shadows, and exhaust fans are sized to remove moisture quickly after showers. Tile extends to the ceiling in wet areas, and all seams are caulked with mildew-resistant products. The final result is a bathroom that feels larger, functions better, and resists moisture damage because every layer was installed with Florida humidity in mind. Plumbing and structural work is inspected and documented to meet local building codes.

Common Questions Before You Start

Homeowners planning a bathroom remodel often want to know how long the work takes, what happens to the plumbing, and what options exist for small spaces.

What does a bathroom remodel include?
It includes removing old tile, fixtures, and cabinetry, then installing new plumbing, moisture barriers, tile, vanity, shower or tub, and lighting. Layout changes and structural adjustments are included when needed to improve function or expand the space.
How long will the bathroom be unusable?
Most bathroom remodels take three to six weeks depending on size and complexity. You receive a timeline that shows when plumbing is disconnected, when rough-ins are inspected, and when fixtures are installed and ready to use.
Why is moisture resistance important in Florida bathrooms?
High humidity can cause mold, warping, and grout failure if materials are not selected and installed correctly. Moisture barriers behind tile, sealed grout, and proper ventilation prevent long-term damage and keep the bathroom looking clean.
What can you do with a small bathroom layout?
You can replace a tub with a walk-in shower to open up floor space, install a wall-mounted vanity to improve clearance, or recess storage into the wall between studs. Layout changes are planned to meet code and maximize usable area.
What should I choose before demolition?
You finalize tile style and layout, vanity dimensions, shower or tub type, fixture finishes, and lighting placement before the work begins. Early selections ensure plumbing and electrical rough-ins are positioned correctly and the project stays on schedule.

NCG Construction Group, LLC handles demolition, plumbing coordination, tile installation, and finish work so your bathroom remodel is completed without gaps or delays between trades. Contact us to review your current layout, discuss moisture-resistant materials, and plan a bathroom that works better for your household and holds up over time.